Welcome to Dongguan Tiancheng Machinery Co., Ltd
Our company has been established for 25 years since 1999.Covering an area of 15,000 square meters.We have rich experience in producing and manufacturing various types of injection molding machines.Meanwhile, our machines have been successfully sold to many countries around the world, so we have extensive experience in overseas sales and after-sales service.
Pen Mobile Cover Earphones Moulding Machines Slipper Making Machinery Rotary Vertical Injection Molding Machine Of Plastic
BIG INJECTION
Our cylinder is not simple injection cylinder.It is big
injection cylinder.It has larger injection pressure and Sectional area.The larger injection pressure will make the products appearance don't have sink mark;The larger Sectional area will make the machine has Steady
pressure.The machine will work steadily
DOUBLE INFRARED SENSOR
Our machine has double infrared sensor.It has a greater range of induction which can protect the safety of the workers better.When the machine start to be in injection and the worker's hand is between the infrared sensor,the upper platen will go up and the machine will stop
Brand Name |
Tiancheng |
|
Style |
VERTICAL |
Condition |
New |
|
Model NO. |
TC-550-2R |
Screw Diameter (MM) |
30-36 |
|
Max.Hydaulic Pressure(Kg/cm3) |
140 |
Maximum injection Pressure (Kg/cm2) |
2177-1512 |
|
Pump Output (L/min) |
53 |
Theoretical Shot Volume (Cm3) |
98-142 |
|
Oil Tank Capacity (L) |
166 |
Maximum Shot Weight (G/oz) |
87/3.1-160/5.6 |
|
Cooling Water Consumption(L/H) |
600-800 |
Injection Rate (Cm3/sec) |
68-97 |
|
Electric Power (KW) |
7.5 |
Screw Speed (R/Min) |
0-210 |
|
Total capacitance (KW) |
2.8 |
Screw Rate (MM) |
140 |
|
Total Wattage (KW) |
10.3 |
Nozzle Retraction Stroke (MM) |
220 |
|
Machine dimension(M) |
2.05*1.7*2.6 |
Clamping Force (Ton) |
55 |
|
Weight of Machine (KG) |
3300 |
Opening Force (Ton) |
7.2 |
|
Plastic Processed |
PP, ABS, FRPP/PVC, PE, ABS/PP, PE/PP |
Rotary table diameter(MM) |
848 |
|
After-sales Service Provided
|
Video technical support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Online support |
Distance Between Tie-Bere (MM) |
|
|
After Warranty Service
|
Video technical support, Online support, Spare parts, Field maintenance and repair service |
minimum Mold Thickness (MM) |
180/240 |
|
Warranty |
1 year |
Opening Stroke (MM) |
200 |
|
Applicable Industries |
Manufacturing Plant, Construction works , Energy & Mining, Other |
Max-Distance opening mold (MM) |
380/440 |
|
|
|
Max.Mold Size |
330*270 |
|
|
|
Ejector Force (Ton) |
1.3 |
|
|
|
Ejector Stoke (MM) |
35 |
|
|
|
We have professional engineers team who can design suitable vertical injection molding machines according to your requests. If you need us to customize the machine for you, Please tell us below information at your best:
1) The size of the mold? The product pictures? The product Drawing/Specifications?
2) How many PCS of products are made in one mold? How many gram per product?
3) What′s the material will be used for the products: Rubber, PP, ABS, PE, PVC, TPE, TPU, POM, PA66, PBT, PS, Glass Fibre, HDPE, etc.?
MULTILINGUAL
Our machine computer language could be programmed into: Chinese, English, Korean, Russian, Arabic, Polish, Thai, Turkish, Spanish and Vietnamese.
This will enable customers to easily use the machine.
1.How to choose injection molding machine?The injection weight should be about 1.2x product's weight; The tie bar space should be bigger than the mold dimension; Contact with us for more information.
2.How to pay?50% deposit T/T in advance, the balance50% payment by T/T before delivery (we accept payment by T/T, L/C etc.)
3.ls that possible for your company to send engineer to install machine for commissioning,even train our workers?Yes, we can send our engineer to your factory for installing, commissioning, training. We have some engineers flying among different countries for after sale service and technical support. As per experience, if everything OK usually 5-15 days is enough. Therefore, before shipment, we need you to prepare invitation letter for visa. However, please be noted that all cost happened for visa,travel, hotel should be paid in advance by customers. In addition, we cannot guarantee each visas successful.
4. If we buy your machines, is there any warranty?Yes, definitely. Totally 12-months warranty after shipment for mechanical parts. We are responsible for broken parts within12-months. We will supply those parts in freeway but the possible transportation cost should be paid by clients.
After Sale |
Installation, debug
|
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary. |
Training
|
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures. |
Quality guarantee |
We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. |
After After sales |
After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. |