Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Brand Name | Tiancheng | Style | VERTICAL | |
Condition | New | Model NO. | TC-400-1S | |
Screw Diameter (MM) | 28--32 | Max.Hydaulic Pressure(Kg/cm3) | 140 | |
Maximum injection Pressure (Kg/cm2) | 1999-1742 | Pump Output (L/min) | 41 | |
Theoretical Shot Volume (Cm3) | 73--96 | Oil Tank Capacity (L) | 138 | |
Maximum Shot Weight (G/oz) | 65/2.2--86/3.0 | Cooling Water Consumption(L/H) | 600--800 | |
Injection Rate (Cm3/sec) | 0--180 | Electric Power (KW) | 5.5 | |
Slide Stroke (R/Min) | 430 | Total capacitance (KW) | 2.4 | |
Screw Rate (MM) | 220 | Total Wattage (KW) | 7.9 | |
Nozzle Retraction Stroke (MM) | 220 | Machine Specification(M) | 1.6*1.05*2.45 | |
Clamping Force (Ton) | 45 | Weight of Machine (KG) | 2000 | |
Opening Force (Ton) | 7 | Plastic Processed | PP, ABS, FRPP/PVC, PE, ABS/PP, PE/PP | |
Platen Size (MM) | 600*430 | After-sales Service Provided |
Video technical support, Free spare parts, Field installation, commissioning and training, Field maintenance and repair service, Online support | |
Distance Between Tie-Bere (MM) | 450*250 | After Warranty Service |
Video technical support, Online support, Spare parts, Field maintenance and repair service | |
minimum Mold Thickness (MM) | 160/220 | Warranty | 1 year | |
Opening Stroke (MM) | 200 | Applicable Industries | Manufacturing Plant, Construction works , Energy & Mining, Other | |
Max-Distance opening mold (MM) | 360/420 | |||
Max.Mold Size | 360*350 | |||
Ejector Force (Ton) | 1.3 | |||
Ejector Stoke (MM) | 35 |
After Sale | |
Installation, debug |
After equipment reached the workshop of customer, place the equipment according to plane layout we offered. We will arrange seasoned technician for equipment installation, debug and test production at the same time make the equipment reach the rated producing capacity of the line. The buyer need to supply the round tickets and accommodation of our engineer, and the salary. |
Training |
Our company offer technology training to customer. The content of training is structure and maintenance of equipment, control and operation of equipment. Seasoned technician will guide and establish training outline. After training, the technician of buyer could master the operation and maintenance, could adjust the process and treat different failures. |
Quality guarantee | We promise that our goods are all new and not used. They're made of suitable material, adopt new design. The quality, specification and function all meet the demand of contract. |
After After sales | After checking, we offer 12 months as quality guarantee, free offer wearing parts and offer other parts at the lowest price. In quality guarantee, the technician of buyers should operate and maintain the equipment according to seller's demand, debug some failures. If you could not solve the problems, we will guide you by phone; if the problems are still can not solve, we will arrange technician to your factory solving the problems. The cost of technician arrangement you could see the cost treatment method of technician. |